We recognise that members of the community may ave questions regarding our proposals. We have provided below a selection of the most frequently asked questions and our answers, including those from the webinar session.

The proposals

Why do you want to develop this site?

This site is a key gateway site into Kingston Town Centre and will complete the masterplan for the wider Surry House Island Site.
The extant permission is not a viable option for a number of reasons and did not deliver the best scheme for this gateway site. The applicant is seeking to provide a high-quality scheme which delivers much needed homes within this town centre, sustainable site.
The delivery of affordable housing on site in a purpose-built building is unlocked through the delivery of co living accommodation which responds to the diverse population and housing need across the Borough.

What did the previously consented scheme include?

The previously approved scheme included a single building standing at 16 storeys including:
  • 115 residential units, comprising a mix of one, two and three-bedroom apartments
  • 35% affordable housing
  • 75 cycle parking spaces
  •  ground floor space including and café area and terraced space
  • Public realm improvements with amenity space for residents including an external plan area, improvements to the Hogsmill River and private lounge terrace space

What are you proposing at Lever House?

The project has the potential to deliver new homes which are much needed in Kingston.
The project is expected to provide:
  • 272 co-living homes (which equates to 151 ‘traditional’ units)
  • On site housing at a Policy compliant level of affordable housing, including family-sized homes
  • Co-working space
  • A ground floor café which will be open to all
  • Extensive resident amenity space
  • New and improved public realm
  • Naturalisation and improvements to the Hogsmill River
  • Enhanced landscaping to the south of the Hogsmill River

Why do you want to build housing?

Like many areas of Greater London, Kingston has not been immune to housing demand and needs more homes. The Government has specified mandatory house building targets for all local authorities across England. Making best use of previously developed land in sustainable locations, such as this, is essential to meet these targets and reduce pressure for further development on greenfield land.

What types of homes will be built?

The scheme proposes co living homes as well as onsite affordable housing. Post-covid, as working habits have changed, there is demand for working professionals who want to live within a serviced community, where all bills are included within an overall monthly rent.
The co-living block will be privately rented and managed by an operator. The affordable residential housing will be managed by RB Kingston Council or a registered provider.

How much affordable housing will be included?

Having a separate affordable housing block enables the delivery of much needed affordable housing on site – rather that an offset payment. The proposal is seeking a policy compliant level of affordable housing included within this scheme, solely within the affordable block and delivered on-site.

Who will live in the affordable homes provided on site?

Residents on the Council’s housing waiting list will be provided the opportunity to bid for these new properties in accordance with the Council’s processes.
Information on how to apply to be on the housing register can be found here.

When will the scheme be completed if granted planning permission?

Cube Real Estate would like to submit their planning application in the coming months, with a view to starting construction on site in 2027.

Why didn’t you propose this scheme 1st time round?

During the planning process we were under considerable time constraints to deliver a relocation option for Unilever that fitted with their lease expiry in Leatherhead. We were 100% focused on the office scheme and submitted the outline application for a residential scheme with an agreed strategy to revisit and optimise this consent once the office campus was completed.
Subsequent changes in market conditions, building control regulations, and build costs have promoted co-living as the most viable use creating the need for 2 towers to be able to deliver the required affordable housing on site.

Transport, infrastructure and services

What consideration has been given to the impact on local services?

As part of the application the social economics resulting from the proposal are being carefully considered. It is anticipated, as with the extant permission, developer financial contribution will be secured through a S106 legal agreement.
The project is also both Mayoral and Borough CIL liable which is directly used to fund infrastructure such as school, transport and health facilities.

What consideration has been given to the impact on local roads? How will you mitigate this? Will the redevelopment cause more vehicle movements/congestion?

The proposed scheme is car free, except for the provision of blue badge spaces. The forthcoming planning application will be supported by suite of Transport documents in including a Transport Assessment (TA), parking management plan, site wide travel plan and delivery and servicing plans which will model the impact of the development on the local and strategic road network and propose appropriate mitigation where necessary.
With regards to the construction phase and associated construction traffic a Construction and Environmental Plan will be prepared and support the forthcoming application.

Will pedestrians still be able to walk through the site?

During the construction phase pedestrian access will not be permitted.
However, public access through the site, including on both banks of the Hogsmill River will be open once construction is completed.

How many parking spaces will be provided on-site for residents?

In line with the previously consented scheme and policy, this development will be car-free except blue badge spaces.

How many cycle parking spaces will be provided?

Safe and secure cycle parking is provided for both the affordable housing and co-living units.
Cycle parking will be provided in line with RB Kingston Council’s policy.

Jobs and economy

How many new jobs could be created?

There will be a number of new employment opportunities created through the construction and operational phase of the development regarding the management of the co living building, co working facility and the publicly accessible café.

How will this development contribute to the local economy?

The creation of new homes close to Kingston town centre will increase footfall to and through the town centres helping increase spending in the local economy.

Co-living

What is co-living?

Co-living is professionally managed housing designed primarily for single people and couples without children. Residents live in self-contained studios with access to shared amenities such as lounges, kitchens, co-working spaces and outdoor areas.

All bills are included in a single monthly cost, offering convenience, cost certainty and flexibility. Co-living supports changing living patterns, helps combat loneliness and encourages community cohesion.

Why does Kingston need co-living?

Kingston has strong employment growth, high housing costs and excellent public transport links. These factors make a strong case and demand for co-living.
The borough is homes to major employers including Unilever at the Eden Campus, Lidl’s Tolworth headquarters, NHS facilities and higher education institutions. This concentration of jobs creates sustained demand for well-located, flexible rental homes for professionals and graduates.
As part of the planning application, the team will submit a co-living needs assessment which summarises co-living need as a whole, assessing the demand within the area and the borough as a whole.

What are the benefits of co-living?

For residents:
  • A more affordable and flexible alternative to one-bed flats
  • Greater privacy and quality than HMOs or shared houses
  • Convenience and cost certainty through all-inclusive rents
  • Helping create social connections and community for people who are new to Kingston
  • Locations close to jobs and public transport, reducing community time and reliance on cars
For Kingston:
  • Supports local employers by helping attract and retain staff
  • Reduce pressure on HMOs and smaller private rented homes
  • Increases town centre footfall and local spending
  • Makes an efficient contribution towards housing targets through high-density, car-light development
  • Reduces the need for HMOs, alleviating pressure on family housing

What demographic and salary range are the co-living units aimed at ?

A full Needs Assessment is being provided with the planning application, but in summary the co-living units are aimed at single people and couples without children who are renting, who would be in full-time professional jobs. It would be ideal for employees of local companies and the hospital. It is also ideal for those who are new to Kingston and don’t have anyone to share with, or who do not wish to live in an HMO. Although the average age is 28-30, it appeals to a wide age range up to 65+.
The average salary in a co-living scheme based on recent research and evidence from other operational schemes in London and the South East is £40,000-£44,000.
The median full-time pay in Kingston upon Thames according to The Annual Survey of Hours and Earnings (ASHE) 2025 is £49,566.

What is the projected rental cost per month for these units?

The rents will be determined by reference to market rates for other types of accommodation. The units will be priced at a discount to the all-in cost of renting a one-bedroom flat, but at a likely premium to a room in an HMO, after allowing for all bills, use of all communal spaces for which a resident might otherwise pay extra, and the quality and location of the scheme.

How many co living units per floor will overlook people’s homes and gardens in the conservation area?

The separation distances to the Fairfield / Knights Park conservation area (to the closest properties) are in excess of the minimum 21m stated in the Kingston Residential Design SPD.

How big are the co-living units i.e. how many bedrooms for each shared unit?

All co-living units will be designed to meet the minimum size requirements of the GLA’s Large-scale purpose-built shared living (LSPBSL) London Plan Guidance (LPG). Therefor no smaller than 18m2 for a standard sized unit, and around 25m2 for an accessible unit (at least 10% of all co-living units will be designed to be accessible units). Co-living units are designed as self-contained studios, with a double bed space.

Where is the evidence that co-living leads to improved mental health?

In co-living developments, the inclusion of high-quality amenity areas fosters a sense of community. Evidence suggests that these high-quality communal living arrangements reduce feelings of loneliness and increase the sense of wellbeing.

Height, design and massing

How tall will the proposed development be?

It is currently proposed that the affordable housing block will be 13-storeys and the co-living block will be 19-storeys.

Why have the proposals increased in height?

Since the approval of the outline planning application, the team have undertaken a detailed review of the scheme, to assess its viability and ensure that the site brought forward is of the highest quality scheme, optimising delivery of residential accommodation on this brownfield sustainable town centre site.

Through the review, it’s concluded that the single-story residential tower is not a deliverable scheme, and this is for several reasons. Firstly, since the approval of the previous scheme, market conditions have changed and it’s no longer possible or viable to deliver the scheme, particularly including the benefits that are included like the level of affordable housing and improvements to the Hogsmill River.

Additionally, the requirements of the Building Safety Act mean the scheme does not deliver the best optimisation or delivery of residential units on this town centre site.

The proposed scheme is for co-living and stand-alone affordable housing. Due to the operational needs of co-living, the types of housing must be delivered separately and therefore cannot be accommodated within the existing single block.

Do the 13 and 19 storeys include the plant on the roof?

The buildings are 19 residential storeys and 13 residential storeys. There will be an amount of plant on the roof. However, this will be integrated within the architecture. The team are not looking to have any plant poking out the top that could disrupt the Kingston skyline.

How many units and of what number of rooms are in the 13-storey building i.e. the affordable accommodation

The team are in discussions with both the GLA and the Local Planning Authority with the final quantum mix of the affordable units in line with policy.
In the affordable block, the tenure mix will focus heavily on family size units, with the size of these units confirmed to meet London Plan Guidance.

How many buildings will be included within the proposed development?

The proposals include two slimmer buildings that sit more comfortably in the townscape.

On the eastern side what is the width of the proposed tower (19 storeys) in comparison with the current permitted building (what is the increase in meters and %)?

The eastern length of the proposed co-living building in total is around 30m; although the massing is divided into two elements of around 13.5m with a central recess between them. The current lever house eastern façade is an uninterrupted length of just over 39m, and a total of just over 44m along its full length. The consented scheme has a different orientation to the proposed co-living building and existing lever house, with the smaller eastern dimension of 23m – and a wider southern aspect dimension of 40m.

Are there planned to be balconies on either building ?

Private balconies will be provided to the affordable building.

Could you please clarify the anticipated lifespan of the buildings?

In the UK, the typical design life for a new multi-unit residential scheme (such as those proposed) is generally at least 60 years. This benchmark comes from BS 7543 (the British Standard guide to durability of buildings). As part of the planning application submission, the design team will demonstrate that the co-living building could easily be adapted to a traditional C3 residential building in the future.

What is the physical distance in metres between the two proposed tower blocks?

At its narrowest point, the distance sits at around 9m tapering out to around 18m. The buildings have been designed to minimise overlooking and maximise daylight sunlight; a full daylight and sunlight analysis will be submitted as part of the planning application submission.

Will daylight/sunlight for neighbouring properties be impacted?

A full daylight, sunlight and overshadowing assessment will be included with the planning application that will scientifically demonstrate the magnitude of any effects.

Do you have other graphics that would show the impact as seen from the Market square or the conservation area for example?

As part of the Environmental Statement’s Townscape and Visual Impact Assessment and Heritage Assessment accurate visual representations of the proposal set within existing, winter, photography will be provided from agreed viewpoints. The accurate visual representations will be prepared in accordance with the Landscape Institute’s Technical Guidance Note 06/19 Visual Representation of Development Proposals. These viewpoints are similar to those assessed as part of the consented scheme’s planning application; however, they have been refined to focus on the site and proposal.
The viewpoint selection has been informed by the 2018 Kingston View Study and Richmond’s 2025 Draft Local Views SPD and have been agreed as part of the pre-application discussions with Kingston’s Conservation and Design Officers.
The selection includes three viewpoints from the Market Place and 26 viewpoints fall within the surrounding conservation areas.

Where is the overshadowing visuals based on June i.e. summer rather than March (spring)?

Overshadowing analysis is currently being undertaken for the month of June.

Will visuals of the new development from the east and western perspective be provided in the future?

Yes, a number of views have been selected and agreed with Kingston’s Conservation and Design Officers from both east and west perspectives to be assessed as part of the Townscape and Visual Impact Assessment and Heritage Assessment

Will information regarding overlooking be made available?

All daylight/sunlight surveys will be available to view once a planning application has been submitted to Kingston Council.

Will the developer be applying for the London and Affordable Homes programme 2026-2036 grant funding which has just opened?

The applicant will explore any available grant to maximise the amount of affordable housing that could be delivered.

Environment and sustainability

How will you increase biodiversity on the site?

Whilst a biodiversity net gain will be achieved on site, the landscape strategy will seek to maximise opportunities offered by the Living Street concept throughout the masterplan as well as using existing vegetation along the edges of the site for the provision of additional amenity functions.
Significant planting will be delivered on site, particularly along the Hogsmill River.

How will you mitigate any environmental impacts?

The applicant will prepare an Environmental Impact Assessment that will accompany the planning application alongside a suite of technical assessments that will include ecological and sustainability reports that will assess and mitigate the impact on the environment.

What is the flood rating of this site?

The site is designated by the Environment Agency as being in Flood Zone X, which is the lowest flood risk rating. A Flood Risk Assessment will accompany the planning application to analyse the flood risks. A Surface Water Drainage Assessment will also be prepared to ensure sustainable drainage techniques are used to avoid increase in surface water runoff.

How could this development affect the Hogsmill Chalk stream?

The team will be preparing ecology appraisals and assessments that will form part of the full planning application. As part of these assessments, they will be looking at Chalk streams and agreeing an approach with the Environmental Authority.

Have you done a bat study along the Hogsmill?

The team will be preparing ecology appraisals and assessments that will form part of the full planning application. 

Construction

How will construction logistics be managed to minimise disruption?

A Construction and Environmental Management Plan will be submitted as part of any forthcoming application. Construction logistics will be carefully planned to ensure smooth operations while minimizing impact on the community. This includes designated access routes, scheduling to reduce peak-hour traffic, dust and noise control measures, and clear communication with residents about ongoing works.

How will long-distance and large load deliveries be coordinated?

To optimise efficiency and reduce local congestion, long-distance and large load deliveries will be scheduled outside peak hours where possible. Vehicles will follow pre-approved routes to minimize disruption, and just-in-time delivery systems.

What impacts will there be from construction?

The planning application will require Cube Real Estate to prepare and implement a detailed Construction and Environmental Management Plan (CEMP) which sets out methods of work, the hours construction work can take place on the site in order to ensure works are undertaken in line with methodology to be approved by RB Kingston Council officers.

How long will construction take?

Subject to approvals, main works could start on site in 2027 with an anticipated completion in 2029.

Consultation

How will you involve the local community in the consultation and engagement process?

Cube Real Estate is committed to working with the community and local stakeholders at all stages of the project. We would like the community in Kingston to help us deliver a project that all of Kingston can be proud of. As such, our engagement programme has been designed to encourage participation from residents early in the planning application process.

How will long-distance and large load deliveries be coordinated?

Cascade has been appointed by Cube Real Estate to manage the overall engagement for the project focused on ensuring the consultation and engagement is as extensive and wide reaching as possible. The aim is to make the engagement accessible to all residents in Kingston.

Who is Cascade?

Cascade is a specialist, strategic consultancy specialising in community engagement and advocacy across the built environment sector.

Will my views matter?

Yes, your views matter as we want the community to engage in a conversation about how new development can successfully integrate in terms of its use and design. All views are welcome, and we encourage the community to give us their feedback.

Will our feedback on the plans feed into your application?

Yes, your feedback will inform the design and planning application process for the proposed development.

Are you planning to do more consultation?

To consult on these proposals the team have now hosted an in-person event in Kingston and an online webinar to talk through the plans and field questions from residents.
Alongside this, the team launched a project website that has been regularly updated with information on the plans and allows interested residents to offer feedback.
Our community consultation is now closed. We would like to thank all of those who have provided feedback on our proposals.

Is there a catchment area in which you dropped leaflets to 2,600 households?

Yes. A summary of the consultation approach will be submitted along with the planning application in a document named the Statement of Community Involvement.

There was a delay in materials arriving to the in-person consultation event so I couldn't review the content on the day, how can I view the information?

We understand that there was a slight delay in the materials arriving for the event and want to apologise for any inconvenience caused.
All information displayed at the in-person event, a full recording of the webinar and the feedback form are now available on the project website.